Customization: | Available |
---|---|
Type: | Tubeless |
Diameter: | ≥22" |
Still deciding? Get samples of US$ 100/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Multiple grooves edges offer superior traction on all surfaces.
2.Specially placed blades for optimized ice and snow traction.
3.Unique groove shape for optimized self-cleaning in all conditions.
4.Wide-base construction for high flotation, improved stability and reduced ground pressure.
5.Flexible block elements for minimized stone retention.
We are dedicated to offering ON/Off Road tyre/wheel applied to:
- Construction Machinery (Loader, ADT, Skid-Steer, Grader)
- Transportation (Truck, Bus, Trailer)
- Agricultural/Irrigation Equipment (Tractor, Combine Harvester, Trailer)
- Forestry Machine (Harvester, Forwarder, Skidder)
- Material Handling (Reach stacker, Forklift)
SIZES | PR | LOAD INDEX | TRA CODE | TOP SPEED (km/h) | Q'TY/40HQ | Order Quantity | Shipment Quantity | RE-MARK |
11.00R20 | 22PR | 22PR(160/156B) | 230 | |||||
12.00R20 | 22PR | 22PR(162/158B) | 204 | |||||
12.00R20 | 22PR | 22PR(162/158B) | 204 | |||||
12.00R24 | IND-5 | ★★★(180A5) | 170 | |||||
L-5S | ★★★(177A5) | 170 | ||||||
★★★(158/155F) | 170 | |||||||
13.00R25 | E3 | ★★★(163B) | ||||||
14.00R20 | MINING | 20 (164/161F) | 120 | |||||
HIGHWAY | 20 (164/161F) | 120 | ||||||
17.5R25 | ☆☆ | 182A2/167B | E-3/L-3 | 10/50 | 90 | |||
20.5R25 | ☆☆ | 193A2/177B | E-3/L-3 | 10/50 | 64 | |||
23.5R25 | ☆☆ | 201A2/185B | E-3/L-3 | 10/50 | 44 | |||
26.5R25 | ☆☆ | 209A2/193B | E-3/L-3 | 10/50 | 34 | |||
26.5R25 | ☆☆ | 209A2/193B | E-3/L-3 | 10/50 | 34 | |||
29.5R25 | ☆☆ | 216A2/200B | E-3/L-3 | 10/50 | 24 | |||
29.5R29 | ☆☆ | 218A2/202B | E-3/L-3 | 10/50 | 20 | |||
17.5R25 | ☆☆ | 182A2/167B | E-3/L-3 | 10/50 | 90 | |||
20.5R25 | ☆☆ | 193A2/177B | E-3/L-3 | 10/50 | 64 | |||
23.5R25 | ☆☆ | 201A2/185B | E-3/L-3 | 10/50 | 44 | |||
26.5R25 | ☆☆ | 209A2/193B | E-3/L-3 | 10/50 | 34 | |||
29.5R25 | ☆☆ | 216A2/200B | E-3/L-3 | 10/50 | 24 | |||
14.00R24 (395/95R24) | ☆☆☆ | 170E | E-2 | 70 | 116 | |||
14.00R25 (395/95R25) | ☆☆☆ | 170E | E-2 | 70 | 116 | |||
16.00R24 (445/95R24) | ☆☆ | 161A8 | G2 | 70 | 80 | |||
17.5R25 (445/80R25) | ☆☆☆ | 170E | E-2 | 70 | 90 | |||
16.00R25 (445/95R25) | ☆☆☆ | 179E | E-2 | 70 | 80 | |||
20.5R25 (525/80R25) | ☆☆☆ | 179E | E-2 | 70 | 64 | |||
1800R25 (505/95R25) | ☆☆☆ | 186E | E-2 | 70 | 44 | |||
15.5R25 | ☆☆ | 176A2/160B | L-2/E-2 | 10/40 | 120 | |||
17.5R25 | ☆☆ | 182A2/167B | L-2/E-2 | 10/40 | 90 | |||
16.00R25 | ☆☆☆ | 179E | E-2 | 70 | 80 | |||
20.5R25 | ☆☆ | 193A2/161B | L-2/E-2 | 10/40 | 64 | |||
23.5R25 | ☆☆ | 201A2/170B | L-2/E-2 | 10/40 | 44 | |||
26.5R25 | ☆☆ | 209A2/193B | L-2/E-2 | 10/40 | 34 | |||
29.5R25 | ☆☆ | 216A2/200B | L-2/E-2 | 10/40 | 24 | |||
23.5R25 | ☆☆ | 185B | E-4 | 50 | 44 | |||
26.5R25 | ☆☆ | 193B | E-4 | 50 | 34 | |||
29.5R25 | ☆☆ | 200B | E-4 | 50 | 22 | |||
29.5R29 | ☆☆ | 202B | E-4 | 50 | 18 | |||
26.5R25 | ☆☆ | 201A2 | L-4 | 10 | 40 | |||
29.5R25 | ☆☆ | 216A2 | L-4 | 10 | 24 | |||
29.5R29 | ☆☆ | 218A2 | L-4 | 10 | 22 | |||
35/65R33 | ☆☆ | 224A2 | L-4 | 10 | 16 | |||
20.5R25 | ☆☆ | 193A2 | L-5 | 10 | 50 | |||
23.5R25 | ☆☆ | 201A2 | L-5 | 10 | 36 | |||
26.5R25 | ☆☆ | 209A2 | L-5 | 10 | 28 | |||
29.5R25 | ☆☆ | 216A2 | L-5 | 10 | 24 | |||
29.5R29 | ☆☆ | 218A2 | L-5 | 10 | 20 | |||
35/65R33 | ☆☆ | 224A2 | L-5 | 10 | 16 | |||
23.5R25 | ☆☆ | 201A2 | L-4 | 10 | 36 | |||
26.5R25 | ☆☆ | 209A2 | L-4 | 10 | 28 | |||
29.5R25 | ☆☆ | 216A2 | L-4 | 10 | 24 | |||
20.5R25 | ☆☆ | 193A2 | L-5 | 10 | 50 | |||
23.5R25 | ☆☆ | 201A2 | L-5 | 10 | 36 | |||
26.5R25 | ☆☆ | 209A2 | L-5 | 10 | 28 | |||
29.5R25 | ☆☆ | 216A2 | L-5 | 10 | 24 | |||
29.5R29 | ☆☆ | 218A2 | L-5 | 10 | 20 | |||
35/65R33 | ☆☆ | 224A2 | L-5 | 10 | 16 | |||
17.5R25 | ☆☆ | 182A2 | L-5s | 10 | 80 | |||
20.5R25 | ☆☆ | 193A2 | L-5s | 10 | 50 | |||
1800R25 | ☆☆ | 204A2 | L-5s | 10 | 40 | |||
23.5R25 | ☆☆ | 201A2 | L-5s | 10 | 36 | |||
26.5R25 | ☆☆ | 209A2 | L-5s | 10 | 28 | |||
29.5R25 | ☆☆ | 216A2 | L-5s | 10 | 20 | |||
29.5R29 | ☆☆ | 218A2 | L-5s | 10 | 20 | |||
35/65R33 | ☆☆ | 224A2 | L-5s | 10 | 16 | |||
16.00R25 | ☆☆ | 177B | L-3/E-3 | 10/50 | 60 | |||
600/65R25 | ☆☆ | 187A2/178B | L-3/E-3 | 10/50 | 40 | |||
650/65R25 | ☆☆ | 193A2/180B | L-3/E-3 | 10/50 | 30 | |||
750/65R25 | ☆☆ | 202A2/180B | L-3/E-3 | 10/50 | 20 | |||
850/65R25 | ☆☆ | 207A2/196B | L-3/E-3 | 10/50 | 18 | |||
875/65R29 | ☆☆ | 214A2/203B | L-3/E-3 | 10/50 | 16 | |||
14.00R25 | ☆☆☆ | 168B | E-4 | 50 | 116 | |||
18.00R25 | ☆☆ | 185B | E-4 | 50 | 44 | |||
18.00R33 | ☆☆ | 191B | E-4P | 50 | 36 | |||
21.00R35 | ☆☆ | 201B | E-4T | 50 | 24 | |||
24.00R35 | ☆☆ | 209B | E-4T | 50 | 18 | |||
18.00R25 | ☆☆ | 185B | E-4P | 50 | 44 | |||
18.00R33 | ☆☆ | 191B | E-4P | 50 | 36 | |||
21.00R33 | ☆☆ | 200B | E-4P | 50 | 30 | |||
12.00R24 | ☆☆☆ | 178A5 | IND-4 | 25 | 160 | |||
16.00R25 | ☆☆☆ | 200A5 | IND-4 | 25 | 60 | |||
18.00R25 | ☆☆☆ | 214A5 | IND-4 | 25 | 44 | |||
18.00R33 | ☆☆☆ | 219A5 | IND-4 | 25 | 36 | |||
18.00R33 | ☆☆ | 191B | E-4R | 50 | 36 | |||
21.00R35 | ☆☆ | 201B | E-4R | 50 | 24 | |||
24.00R35 | ☆☆ | 209B | E-4R | 50 | 18 | |||
27.00R49 | ☆☆ | 223B | E-4 | 50 | 12 | |||
30.00R51 | ☆☆ | 230B | E-4 | 50 | 8 | |||
33.00R51 | ☆☆ | 235B | E-4 | 50 | 8 | |||
36.00R51 | ☆☆ | 241B | E-4 | 50 | 6 | |||
40.00R57 | ☆☆ | E-4 | ||||||
27.00R49 | ★★ | TL | E4 | 12 | ||||
30.00R51 | ★★ | TL | E4 | 8 | ||||
33.00R51 | ★★ | TL | E4 | 8 | ||||
37.00R57 | ★★ | TL | E4 | 6 | ||||
42/90R57 | ★★ | TL | E4 | 6 | ||||
40.00R57 | ★★ | TL | E4 | 6 | ||||
46/90R57 | ★★ | TL | E4 | 6 | ||||
50/80R57 | ★★ | TL | E4 | 4 |
Why choose our wheel loader dozer grader caterpillar tire 17.5R25 23.5R25 26.5R25 29.5R25,29.5R29?
(1) our tire is best in quality------ tire treads are with good design, ribs are strong, rubber are best selcted from Malysia,we have soft and hard compond for your choice,all tyres are with true quality warranty.
(2) our tire are strictly controled by each process, we only selling class A quality tire
(3) we put efforts on long terms cooperation,first order,we will need your cooperation to do in nomal payment terms,we have very flexible payment terms up to 90 days after 2 cooperation and alway,we trust our clients and we treat you a partners,we will grow togther with you in your market.
(4) Products have been certified by ECE, E-SOUND, REACH, ISO9001, ISO/TS16949, DOT, GCC, CCC, SONCAP, PVOC, NOM, INMETRO,and other applicable standards required by particular countries